Project Name
Year of Completion
Client
Location
Project Description
Igc’s role
Al Bazergan mobile Substation
2014
Ministry of Oil / South Oil Company SOC
Missan Governorate - Iraq
Design ,Supply and install Two Mobile Substations 132/33KV with a capacity of 16 MVA complete with feeders and one SCADA System to control the two mobile substations.
installation ,startup &commissioning
Project Name
Year of Completion
Client
Location
Project Description
Igc’s role
Al Gharby Electrical Substation
2008
MOE / Electrical Distribution Department in Samawa
Al Muthanna Governorate – Iraq
Supply, install & operate power substation (31.5MW X 2 Units) as turnkey project including all civil and electro-mechanical works.
Capacity: 2X31.5 MW
installation ,startup &commissioning
Project Name
Year of Completion
Client
Location
Project Description
Igc’s role
Renovation of 33 KV H.T. Electrical Power Distribution Network to Supply South of Shamiya Village
2006
Electricity Power Distribution Directorate / Al-Diwaniya
Al- Shamiya Village / Diwaniya Governorate - Iraq
Rehabilitation works for electrical power transmission network 33 KV - 10 KM in length including replacing of old exist step down transformers, columns, wires, cables with new parts.
Installation works for poles cables overhead
TRANSFORMERS PROJECTS
Project Name
Year of Completion
Client
Location
Project Description
Igc’s role
Electrical Power Transformer Station-North of Hilla
2010
MoE / General Directorate of Electrical Transmission Projects
Babil Governorate - Iraq
Supplying materials, foundation works for electrical towers and electrical sub-stations and capacitors ,Cables trenches for the project of electrical power transmission of North of Hilla (132) KV.
Electrical installation
PIPELINES PROJECTS
Project Name
Year of Completion
Client
Location
Project Description
Igc’s role
Kirkuk-Baiji Gas Pipeline
On going
Korea Gas Corporation (KOGAS).
Kirkuk-Baiji - Iraq
This project is considered one of the important projects executed by the companies of the International Group for Constructions. The client of this project is Korea Gas Corporation (KOGAS). The scope of work of IGC is to complete the engineering, procurement and construction of (16”) liquefied petroleum gas in which the total length of the pipeline is 25,723 km and (18”) dry gas pipelines in which the total length of the pipeline is 32,298 km. The contract was signed on August, 29th 201
complete the engineering, procurement and construction.
ELECTRICAL CABLES AND JOINTS
Project Name
Year of Completion
Client
Location
Project Description
Igc’s role
OMAN Cable
2014
South Refineries
Basra Governorate – Iraq
Supply electrical cables different size (Length : 70 KM).
procurement
Project Name
Year of Completion
Client
Location
Project Description
Igc’s role
Electrical Joints
2014
South Refineries Company (SRC)
Basrah Governorate – Iraq
Supply of Electrical Joints
procurement
Project Name
Year of Completion
Client
Location
Project Description
Igc’s role
Switch Gear Supplying (KHANAH)
2014
The General Directorate for Electricity Energy Transmission \ South
Basrah Governorate – Iraq
Supply of Switch Gear
procurement
Project Name
Year of Completion
Client
Location
Project Description
Igc’s role
LEBANON Cable
2014
South Refineries Company (SRC)
Basrah Governorate – Iraq
Supply Cables
procurement